Pakistan Chemical Factory

Project address:Lahore, Pakistan
Project Area: 4225 square meters
Project Finished Time: Built in 2019-2020
Project Detail: Multi-story steel structures
Project Total Steel weight: 600 tons

 

PROJECTS Details

The Chemical factory project was completed in 2019-2020 and is located in Lahore, Pakistan. Project area is about 5000 square meters. The total steel weight more than 600tons.The steel structure materials are Q355B and Q235B, and the surface of the components is painted.

Parameter Details
Materials Q355B and Q235B
Area 4225 square meters
Total Steel Weight 600tons +
Structure type multi-story steel structure

Planning an Industrial Steel Building

A factory or workshop should be planned around the production process, equipment and maintenance access. The structural scheme depends on equipment loads, crane operation, column grid, clear height, utility routes, ventilation, fire zones and the required delivery scope. These inputs should be confirmed before fabrication drawings are developed.

Information needed for an initial proposal

  • Project location, building use and production flow
  • Required dimensions, column spacing and usable clear height
  • Equipment layout, point loads, crane capacity and lifting height
  • Openings, platforms, pipe racks and maintenance access
  • Local structural design criteria and corrosion environment
  • Envelope, insulation, ventilation, fire-protection and expansion plans

Compare related industrial steel structure projects, review our engineering and fabrication services, or submit your project requirements for a preliminary review.

Related PROJECTS

Hydroelectric power station in Peru
Netherlands Exhibition Hall1
Cold storage in Peru
Paint shop in Thailand

Video introduction

Get in touch

Get in touch

To bring high quality products and services to thousands of households