Tonghe Hanlan Phase V

Category:

Tonghe Hanlan Phase V | LargeScale Industrial Steel Structure Installation

This steel structure installation project is for the New Environmental Building Materials Industrial Park – Tonghe Hanlan Phase V, with a planned construction area of 48,000 square meters and approximately 2,000 tons of main steel structures. This project sets new benchmarks for our company in terms of installation area, construction height, and completion time, showcasing our comprehensive capabilities and rich experience in largescale steel structure installation.

Once completed, the project will serve as the foundation for a modern industrial park integrating environmental building materials production, exhibition, and trading, facilitating industrial development and creating a logistics and business hub.

 

PROJECTS Details

Project Name: Tonghe Hanlan Phase V – Environmental Building Materials Industrial Park

Construction Area: 48,000 square meters

Main Steel Weight: Approx. 2,000 tons

Project Type: Industrial steel structure installation

Application: Industrial park facilities integration & structural support

Client Requirement: High construction scale, elevated installation heights, tight schedule control

PROJECTS Details

Product Parameters

Item Details
Planned Construction Area 48,000 square meters
Weight of Main Steel Structures Approximately 2,000 tons
Structure Type Industrial steel structure
Application Industrial park facilities

 

Features and Advantages

Leading Construction Scale

Faced with a major installation project covering 48,000 square meters, our company relies on its abundant prior knowledge and skilled building crews. This approach helps us distribute resources effectively. It also ensures steady advancement and timely completion of the work.

Advanced Technical Problem-Solving

Due to the varied construction heights required in this project, we applied advanced construction equipment and technology to address multiple challenges associated with high-altitude steel structure work, ensuring construction quality and on-site safety.

Strict Schedule Control

While maintaining high standards of quality, precise control over the project schedule enables timely delivery, freeing up valuable time for subsequent construction phases and reducing time-related expenses.

Full-cycle Quality Supervision

From raw material procurement to installation, careful quality control remains in place. Each load of steel follows high standards. Plus, the on-site installation follows detailed building rules. All this ensures a solid and long-lasting building structure.

 

Application Areas

This project is designed to support the development of the environmental building materials industry by providing a professional industrial platform for research, development, production, and sales.

In addition, the steel structure installation technologies and experience accumulated from this project provide reliable technical support and reference cases for future large-scale construction efforts, such as:

Large Industrial Plants

Logistics Warehousing Centers

Commercial Complexes

Other Projects with High Spatial and Structural Requirements

 

Message / E-Mail

Have questions or need customized steel structure solutions? Send us a Message or contact us via email — our expert team will respond promptly to assist with your project planning and execution.

Why This Project Matters

Demonstrates Expertise in Large-Scale Steel Installations
High-Altitude Construction Capability
Advanced Technical Equipment & Safety Measures
Efficient Schedule Management with Full-Cycle Quality Control
Foundation for Modern Industrial Park Operations

This project stands as a signature example of our ability to deliver high-quality, large-scale steel structure installations on time and to exacting standards — empowering industrial transformation and infrastructure development.

Planning an Industrial Steel Building

A factory or workshop should be planned around the production process, equipment and maintenance access. The structural scheme depends on equipment loads, crane operation, column grid, clear height, utility routes, ventilation, fire zones and the required delivery scope. These inputs should be confirmed before fabrication drawings are developed.

Information needed for an initial proposal

  • Project location, building use and production flow
  • Required dimensions, column spacing and usable clear height
  • Equipment layout, point loads, crane capacity and lifting height
  • Openings, platforms, pipe racks and maintenance access
  • Local structural design criteria and corrosion environment
  • Envelope, insulation, ventilation, fire-protection and expansion plans

Compare related industrial steel structure projects, review our engineering and fabrication services, or submit your project requirements for a preliminary review.

Related PROJECTS

Berlin steel warehouse
Netherlands Exhibition Hall1
Logistics workshop in Algeria
Paint shop in Thailand

Video introduction

Get in touch

Get in touch

To bring high quality products and services to thousands of households